Breiðholtslaug Pool opened on January 17, 1981. The extension opened in 1991. The building is about 2,200 square meters.
Guðmundur Þór Pálsson and Hallur Kristvinsson
Sveinbjörn Sigurðsson.
Opening Day, January 17, 1981. Extension 1991.
Construction of the indoor pool in Breiðholtslaug Pool began in 1976. The pool was originally built as a teaching pool for the schools in Breiðholt. For the first two years, only the indoor pool was in operation. The main pool opened in 1981. The residents of Breiðholt had limited access to the pool for the first few years, and it was initially called the Polytechnic Swimming Pool.
Building size: | 2,237 m2 | 670 m2 |
Lot size: | 4,080 m2 | 200 |
Length: | Max depth: | Min depth: |
Surface area: 312.52 m2 | Volume: 503 m3 | Temperature: |
Length: 12.5 m, width: | Max depth: | Min depth: |
Surface area: 100 m2 | Temperature: |
Length: 12.5 m, width: | Max depth: | Min depth: |
Surface area: 100 m2 | Temperature: |
Length: | Max depth: | Min depth: |
Surface area: 12 m2 | Temperature: |
Tub 1 | Temperature: | 4.5 m2 | 4.5 m3 |
Tub 2 | Temperature: | 4.5 m2 | 4.5 m3 |
Whirlpool bath | Temperature: | 9 m2 | 8.1 m3 |
Sauna | Women's: 12 m2 | Men's 12 m3 |
Steam room | Common to men and women - 34 m2 |
Hallgrímur Jónsson 1981-1997
Gunnar Hauksson 1997-2004
Gísli Jóhann Jensson 2004-2010
Sólveig Valgeirsdóttir 2011-2018
Hafliði Páll Guðjónsson 2019-