English translation
Hi! The English site is only a beta for now and still has many errors (especially in names and locations).
We are working hard to fix them and making more content available than ever before so expect constant updates.
Cost analysis based on the lifetime of a maneuver. Demonstrates how much it actually costs to build and operate a manpower for a certain number of years. The factor that most influences the results is the maintenance needs, which is why it is important to choose the right construction material for the building in question.
An accounting model has been prepared to estimate the cost of a building for a certain period of time. Into the model are entered all the main information and assumptions of the building, in order to form all the main building elements. Once the structure has been identified in the model, then the model provides results in the form of a crown figure. This crown figure indicates how much it will cost to run the building for a given number of years. The annual cost gives the owner of the building a very clear picture of the operating costs and where exactly they lie.
Tips and queries about living resources.
You can send an inquiry to info@reykjavik.is and usk@reykjavik.is